Warehouse Storage Rack, Flow Through Racking with High Quality
Based on many years of rich experience in Slurry Pump manufacturing and
design, NAIPU can undertake OEM customization for the whole set of pump
and various spare parts. The Slurry Pump Spare Parts can be made of
various material according to customer`s requirement, Such as : Alloy
20, Hastelloy Alloy , A 61,ceramic and polyurethane and so on.
OEM Slurry Pump, OEM Slurry Pump Parts, OEM Impeller, OEM Volute, OEM Mission Pump, OEM Goulds Pump, OEM High Chrome Slurry Pump Parts Shijiazhuang Naipu Pump Co., Ltd. , https://www.naipu-pump.com
Advantages:
1. Space utilization is about 85%
2. Suitable for substantial homogeneous goods.
3. Pallet size should fit racks
Features:
1. Individual access to all pallets to full height of warehouse
2. Simple stock rotation achieved
3. Easy beam adjustment accommodates variable pallet heights
4. Compatible with many handling equipment styles
5. Conventional tolerance for floors when used to 10m high
6. Lower level pallets can be located on the floor (picking pallets)
7. Accessories available can accommodate every unit load type
Structure:
1. The racking is developed from the medium duty racking.
2. Aluminum or steel roller rail are equipped between a pair of beams per layer to form a slope of 3 degree, and under the fluency of gravity, first in first out of goods are realized.
3. It is convenient to access and suitable for such places as the two sides of the assembly lines, distribution centers, etc.
4. The height of the racking is normally lower than 2.5M and the loading capacity of each layer is 1000kg at the most.
For a quick price, please answer following questions:
1. The CAD drawing of the warehouse (if available)
2. Size (Width, Depth, Height)
3. How many loads/levels
4. Quantity
5. Port of destination (for a CFR or CIF price basis)/ or FOB Nanjing
6. Loading capacity of each layer
Contact Information
Casy
Tel: 0086-025-85363177, 0086-13851406693
Fax: 0086-025-86109278
Material:
High quality rolled steel
Surface treatment:
Powder coating
Color:
Selective
Capacity:
1000kg Max per level
packing
Carton, bubble film, PE stretch smoothly or as client's suggestion
Delivery time:
10~30 days depending on order quantity
Delivery port:
Shanghai