Fangyuan Group TC7030 Tower Crane: Optimization and Innovation Design
The prototypes in this exhibition have been optimized to improve the following aspects: 1. Balance arm weight outer frame changed from angle steel to steel plate as a whole. No concrete form is required for pouring concrete at the construction site. At the same time, the balance weight is smooth and smooth, eliminating problems such as inaccurate balance weight and difficult installation due to deformation of the template; 2. Tower crane platform and railings are universally designed to facilitate production management. The railings are changed to bending parts, which are beautiful and generous; 3. Optimized design of the boom and tie rod to ensure strength, beautiful appearance, while reducing the head weight of the tower crane, optimizing the performance of the force. Optimized design 4. The trolley hooks and trolleys are re-optimized. The trolleys are easy to disassemble. The trolleys are equipped with override pins. The main and auxiliary trolleys can all be disassembled in the air to facilitate magnification conversion; at the same time, the hooks are changed to welded structures for easy assembly. , reduce the assembly process to ensure that the wire rope is not easy to remove the groove; 5. All bearing parts are replaced with maintenance-free bearings, reducing user maintenance costs; 6. The optimization and improvement of the upper turret platform, the driver's cabin is more stable, and the installation is more convenient. (This article comes from Fang Yuan Group Hoisting Machinery Co., Ltd. Sun Qinglin clicks to enter Fangyuan Group's online purchase page ) Deutz Engine Diesel Generator sets
The goods are under warranty against defects in material and workmanship for a period of 12 months or 1000 hours ,whichever come first from the date of delivery to the end user except the damageable spare parts of genset caused by incorrect man-made operation, and that the aforementioned warranty for the same taken is back up by the engine and alternator suppliers.
Deutz Engine Diesel Generator Deutz Engine Diesel Generator,Deutz Diesel Generator,Deutz Diesel Power,Deutz Generator Set FUZHOU LANDTOP CO., LTD , https://www.landtopco.com
Balance arm weight outer frame changed from angle steel to steel plate overall bending
Tower crane platform and railings universal design
The boom and lever optimization design
Re-optimization of trolley hooks and trolleys
Optimization improvements
1.Famous engine&alternator
2.Reliable working
Alternator
Stamford, Leory Somer, Engga, Marathon, Siemens, ST/STC etc.
Rigorous testing
must be done before delivery, including 50%
load, 75%load, 100%load, 110%. And all protection function(over speed stop, high water
temperature, low oil pressure, battery Charging fail, emergency stop)
Warranty